CASE STUDIES

240723-Image_2.jpg

30 July 2024

132kV TRANSMISSION LINE CORRIDOR ASBUILT

Vegetation encroachment and 70m clearance corridor requirements visualised using DJI Matrice 350 RTK equipped with the CHCNAV AlphaAir 450 complimented with the Leica P40 Laser Scanner

Stockpile_1.png

11 June 2024

CHCNAV LIDAR STOCKPILE

Stockpile survey comparison between a drone LiDAR flight alongside the conventional method of a surveyor using a GNSS rover.